User Manual

Room automation
Desigo room automation
20
CM110664en_07 291 | 351
Application
the central plant.
Supply VAV flow deviation helps to optimize the fan speed by calculating
the airflow deviation through the supply VAV dampers
Extract VAV flow deviation helps to optimize the fan speed by calculating
the airflow deviation through the extract VAV dampers
Supply VAV flow saturation evaluation (air flow control loop cannot get
enough air to reach setpoint) evaluates the supply VAV saturation signals
from the rooms to optimize the fan speed
Extract VAV flow saturation evaluation (air flow control loop cannot get
enough air to reach setpoint) evaluates the extract VAV saturation signals
from the rooms to optimize the fan speed
Supply VAV setpoint evaluation with the summed setpoints of the supply
VAV the fan's speed can be set for an optimized fan speed when VAV
positions and VAV flow rates are not known
Extract VAV setpoint evaluation with the summed setpoints of the extract
VAV the fan's speed can be set for an optimized fan speed when VAV
positions and VAV flow rates are not known
Loadable central functions (continued)
Application
Central functions 2x VAV supply fire emergency group with off, extract, pressurization or purge
1x Central weather station with:
Outside temperature
Outside brightness
Outside solar radiation
Outside wind speed
Outside precipitation
2x Light manual central operation group
1x Light central control group for emergency situations
4x Shading central facade functions with:
Central weather station brightness calculation supports facade automatic
function
Glare protection function calculates the glare protection state by central
weather station for all facade
Annual shading calculates the glare protection state for all facade by in-
formation from annual shading computer
Thermal protection for unoccupied rooms by central global radiation
sensor on weather station
Three delayed distribution groups for central blind commands for big
buildings
2x Shading manual central operation with 3 delayed distribution groups for
big buildings
1x Shading service ensures central commanding of blind group with high
priority
1x Shading central protection for all blinds with:
Wind protection
Precipitation protection
Frost protection
Three delayed distribution groups for big buildings
See
Application Catalog
.