User's Manual

Table Of Contents
Remote operation
7.3 Operating via FDT (Field Device Tool)
SITRANS LR250 (HART)
112 Operating Instructions, 01/2014, A5E32220602-AB
7.3.4
Configuring a new device via FDT
The full process to configure a field device via FDT is outlined in an Application Guide which can
be downloaded from our website under
Support
> Application Guides
.
Product page (http://www.siemens.com/LR250)