User's Manual

Table Of Contents
Page 26 IQ Radar 300 PL-611
Installation
Installation
Installation
Installation
Rod Assembly
Rod Extension Requirements
standpipe i.d.
standpipe height mm (inches)*
<100 (4) 100 to 150 (4 to 6) 150 to 200 (6 to 8)
50mm (2)n/r
** **
80mm (3) n/r 50mm 100mm
100mm (4) n/r 50mm 100mm
150mm (6) n/r 50mm 100mm
>150mm (6) n/r n/r n/r
n/r extension not required
* Consult Milltronics for assistance with standpipe sizes not listed.
** application not recommended for 50mm (2) i.d. standpipes greater than 100mm (4) long.
optional
extension
Note:
Ingress of water or process fluids into the connecting threads can
cause reflections at the connection, appearing as false echoes.
Apply Teflon paste to threads and tighten slowly. Ensure that the
rod sections mate securely with no gaps. Do not apply too much
Teflon paste or parts will not mate securely.
Do not use wrenches or pliers. Hand tight only.
Sealant must have
ε
r
< 3
. We recommend a sealant such as
Teflon paste or silicone compound.
Teflon paste
(supplied)
50mm
(2)
100mm
(4)