User's Manual
Table Of Contents
- Table of Contents
- General Information
- Specifications
- Installation
- Location
- Dimensions: IQ Radar 300 with Rod Antenna
- Dimensions: Threaded Rod
- Dimensions: Horn
- Mounting
- Rod Assembly
- Mounting: Rod Assembly
- Mounting: Manhole Covers
- Mounting: Horn Antennas
- Mounting: Waveguide Antenna
- Mounting: Stillpipe or Sidepipe
- Mounting: Horn with Waveguide Extensions
- Mounting: Sanitary Mounting
- Mounting: Location
- Interconnection
- Start Up
- Operation(
- Application Examples
- Parameter Descriptions
- _
- _
- Quick Start Parameters (P001 to P007)
- Volume Parameters (P050 to P053)
- Display and Reading Parameters (P060 to P063)
- Fail-Safe Parameters (P070 to P072)
- mA Parameters (P200 to P219)
- Independent mA Setpoints Parameters (P210 and P211)
- Profile Record Parameters (P330 to P337)
- Auto Record ON and OFF Setpoint Parameters (P334 to P337)
- Installation Records Parameter
- Range Calibration Parameters
- Rate Parameters
- Measurement Verification Parameters
- Communication Parameters
- Echo Processing Parameters
- Algorithm Parameters
- TVT Adjustment Parameters
- P837 Auto Near TVT
- Test Parameters
- _
- Communications: Modbus Register Map
- Communications: Data Types
- Error Handling
- Troubleshooting
- Maintenance(
- Appendix I
- Appendix II
- Appendix III
- Appendix IV
- Appendix V
Page 24 IQ Radar 300 PL-611
Installation
Installation
Installation
Installation
Mounting
Note:
• The straight/taper transition of the rod should extend past the standpipe/vessel
opening. Add extensions as required.
• Refer to the Rod Extension Requirements table.
* The unit in is improperly mounted. The Integral process seal MUST rest on customer flange
as in
.
1/2" NPT or PG 16
conduit entry
wiring access
cover
customer flanged
standpipe to suit
tank
minimum diameter
2" / DIN 50
standpipe/vessel juncture
straight/taper transition
customer flange
integral process seal
* see below