User's Manual
Table Of Contents
- Table of Contents
- General Information
- Specifications
- Installation
- Location
- Dimensions: IQ Radar 300 with Rod Antenna
- Dimensions: Threaded Rod
- Dimensions: Horn
- Mounting
- Rod Assembly
- Mounting: Rod Assembly
- Mounting: Manhole Covers
- Mounting: Horn Antennas
- Mounting: Waveguide Antenna
- Mounting: Stillpipe or Sidepipe
- Mounting: Horn with Waveguide Extensions
- Mounting: Sanitary Mounting
- Mounting: Location
- Interconnection
- Start Up
- Operation(
- Application Examples
- Parameter Descriptions
- _
- _
- Quick Start Parameters (P001 to P007)
- Volume Parameters (P050 to P053)
- Display and Reading Parameters (P060 to P063)
- Fail-Safe Parameters (P070 to P072)
- mA Parameters (P200 to P219)
- Independent mA Setpoints Parameters (P210 and P211)
- Profile Record Parameters (P330 to P337)
- Auto Record ON and OFF Setpoint Parameters (P334 to P337)
- Installation Records Parameter
- Range Calibration Parameters
- Rate Parameters
- Measurement Verification Parameters
- Communication Parameters
- Echo Processing Parameters
- Algorithm Parameters
- TVT Adjustment Parameters
- P837 Auto Near TVT
- Test Parameters
- _
- Communications: Modbus Register Map
- Communications: Data Types
- Error Handling
- Troubleshooting
- Maintenance(
- Appendix I
- Appendix II
- Appendix III
- Appendix IV
- Appendix V
PL-611 IQ Radar 300 Page 17
Installation
Installation
Installation
Installation
Dimensions: Threaded Rod
50mm
(2”)
100mm
(4”)
optional
extension
standard antenna
Teflon paste
(supplied)
Note:
Ingress of water or process fluids into the connecting threads
can cause reflections at the connection, appearing as false
echoes.
Apply Teflon paste to threads and tighten slowly. Ensure that
the rod sections mate securely with no gaps. Do not apply too
much Teflon paste or parts will not mate securely.
Do not use wrenches or pliers. Hand tight only.
Sealant must have
ε
r
< 3
. We recommend a sealant such as
Teflon paste or silicone compound.