User's Manual
Table Of Contents
_
PL-550 11
INSTALLATION _
MOUNTING
FLANGED
For 2" or 3" / DIN 50 or DIN 80, the straight/taper transition of the rod should
extend past the standpipe/vessel opening. Add extensions as required.
For larger diameter standpipes, refer to Extension Requirements.
1/2" NPT
or PG 16
conduit entry
wiring
access
cover
supplied ANSI, DIN flange or sanitary tri-clamp
customer flanged standpipe to suit
tank
minimum
diameter
2" / DIN 50
rod transition
standpipe/vessel juncture