User's Manual

M3P U-series AC EV Charging Station User Manual
14
5.3. Installation preparation
5.3.1. Safety notes for installation
Refer to 2.3 for more safety notes.
Installation and wiring should be done by personnel with professional qualification,
otherwise, hazardous electric shock may result.
Make sure input power supply is entirely disconnected before wiring; otherwise,
hazardous electric shock may result.
Operator must always notice safe protection such as wear protective footwear, wear
goggles, otherwise it may be personal injury.
5.3.2. Tools for installation
Prepare the following tools at least before installing the M3P U-series AC EV Charger.
Sr No.
Tools’ Name Schematic Picture Main Uses
1 Multimeter
Check the electrical connection and
measure the voltage
2 Electric Impact drill
Drill fixing holes in the wall
3 Wrench
Fastening bolt
4 Diagonal pliers
Cut the cable
5 Wire stripper
Peeling cables
6 Crimping pliers
Pressed cable terminal
7 Cross screwdriver
Fastening screw
5.3.3. Ambient
a) Refer to 2.2 for more safety notes.