Product Manual

and use a pipe wrench to tighten the smooth area above the threads.
Step 4Put batteries in
Unscrew the screw cap of the smart tank meter, take out the black box
with the battery and install. After installation, there is a switch behind the
box, turn OFF of the switch to ON.
Observe the indicator light on the panel, make sure the power is on to
complete the configuration.