Product Manual
and use a pipe wrench to tighten the smooth area above the threads.
Step 4:Put batteries in
Unscrew the screw cap of the smart tank meter, take out the black box
with the battery and install. After installation, there is a switch behind the
box, turn OFF of the switch to ON.
Observe the indicator light on the panel, make sure the power is on to
complete the configuration.