Installation guide

Phase 2: Environmental and Infrastructure Analysis and Upgrade Getting Started
1
ShoreTel 14.2 Planning and Installation Guide 21
Phase 2: Environmental and Infrastructure Analysis and
Upgrade
Inventory your existing telephone equipment
Order new phones and/or headsets
Review your need for a ShoreTel Server Appliance
Order a ShoreTel Server Appliance
Review the need for a ShoreTel Enterprise Contact Center Solution
Order a ShoreTel Enterprise Contact Center Solution
Order ShoreTel voice switches
ShoreTel shipping date
Table 2: Environmental and Infrastructure Analysis and Upgrade
Task
Date
Completed
Participate in the Phase 2 conference call
Read ShoreTel's power requirements
Order power upgrades (as necessary)
Scheduled power upgrade completion date
Read ShoreTel's racking requirements
Racking installation date (if racking is ordered)
Read ShoreTel's ventilation requirements
Ventilation system upgrade completion date (if ordered)
Read ShoreTel's recommendations for uninterruptable power source
(UPS)
UPS installation date (if ordered)
Read ShoreTel's cabling requirements
Cabling installation date (if ordered)
Determine the overhead paging needs
Source your Music on Hold needs
Read ShoreTel's LAN requirements
Attach LAN topology map
LAN installation date (if ordered)
Table 1: Voice Communications System Analysis and Ordering (Continued)
Task
Date
Completed