Specifications
Planning and Installation Guide 16 – 1
C
HAPTER
16
Installing ShoreGear
Voice Switches
This chapter provides planning and installation information for the ShoreGear voice
switches. Information on switch connectors and LEDs can be found in Chapter 13,
“Site Requirements and Preparation.”
Checklist
Review the following topics before proceeding to the next chapter:
Planning
The requirements to install a ShoreGear voice switch are basically the same as any
multisite installation. Please refer to the previous chapters in this guide for more
information.
In summary, you must ensure that:
• The IP network between the main and remote site meets the bandwidth, latency,
jitter, and packet loss requirements for a multisite installation.
• The IP network between the main and remote site has quality of service in place
such that voice travels ahead of data.
• You have appropriate firewall considerations in place, including VPN if applicable.
Task Description See
❑ Planning
page 16-1
❑ Safety
page 16-2
❑ Installing ShoreGear-40/8, -60/12, and -120/24 Voice Switches
page 16-3
❑ Installing ShoreGear-T1 or ShoreGear-E1 Voice Switches
page 16-5
❑ ShoreWare Director Switch Configuration
page 16-6










