Specifications
Getting Started
1 – 4 ShoreTel, Inc.
Phase 2: Environmental and Infrastructure Analysis and Upgrade
Participate in the Phase 2 conference call
Read ShoreTel's power requirements
Order power upgrades (as necessary)
Scheduled power upgrade completion date Date:
Read ShoreTel's racking requirements
Racking installation date (if racking is ordered) Date:
Read ShoreTel's ventilation requirements
Ventilation system upgrade completion date (if ordered) Date:
Read ShoreTel's recommendations for Uninterruptable Power
Source (UPS)
UPS installation date (if ordered) Date:
Read ShoreTel's cabling requirements
Cabling installation date (if ordered) Date:
Determine your overhead paging needs
Source your Music on Hold needs
Read ShoreTel's LAN requirements
Attach LAN topology map
LAN installation date (if ordered) Date:
Read ShoreTel's WAN requirements
Attach WAN topology map
WAN upgrade installation date (if ordered) Date:
Read ShoreTel's server requirements
Order your server for the ShoreTel System
Server installation date Date:
Read ShoreTel's desktop requirements
Desktop software upgrade installation date (if required or ordered) Date:
ShoreGear scheduled installation date Date:










