This chapter provides information about preparing your site for the ShoreTel 6.1
system, including concerns such as physical space, environment, and cabling.
Checklist
Review the following site requirement topics before proceeding to the next chapter:
Recommendations
The following recommendations will assist you in planning and preparing your site for
the ShoreTel 6.1 system.
Hire a cabling contractor to install your racks, patch panels, and cabling.
Have an RJ-48C cable ready for each ShoreGear-T1 and ShoreGear-E1 voice
switch.
Task Description See
Recommendations
page 13-1
Voice Switch Requirements
page 13-3
ShoreGear-120/24 Connectors
page 13-9
ShoreGear-60/12 Connectors
page 13-9
ShoreGear-40/8 Connectors
page 13-10
ShoreGear-T1 Connectors
page 13-10
ShoreGear-E1 Connectors
page 13-11
Racks and Cabling
page 13-12
Connector Pinouts
page 13-14