Product Manual
STEP 4 - BRIDGE AND END TRUCK INSTALLATION
4.1 Slide both end trucks into the runways (diagram 4A).
4.2 Install end stops into the runways (diagram 4B).
4.3 Slide hoist trolley into the bridge first.
Diagram 4A. Installing end truck on runway.
6
1/11
Diagram 4B. Installing end stops on runway.
END TRUCK
RUNWAY
1/2” LOCKWASHER
1/2” HEX NUT
1/2-13, 3.5” LONG
HEX BOLT
END TRUCK
RUNWAY
Diagram 4C. Installing hoist trolley on bridge.
HOIST TROLLEY
BRIDGE
TIP: Clean interior of tracks prior to end truck installation using dry vac or compressed air.
TIP: Clean interior of bridge track prior to trolley installation.