User Manual
26 
4.4.6 CT Input 
CT input is available when Heater burnout alarm (C5W, EIW, W options) is ordered. 
Cannot be used for detecting heater current under phase control. 
BCS2 
BCR2, BCD2 
Use the CT (current transformer) provided, and pass one lead wire of the heater circuit   
into the hole of the CT. (Fig. 4.4.6-1) 
When wiring, keep the CT wire away from AC sources or load wires to avoid the external   
interference.   
BCS2 
  (Fig. 4.4.6-1) 
If using 3-phase, pass any 2 lead wires of R, S, T into the CT, and connect them to  
CT1 (
13
-
14
) and CT2 (
14
-
15
) terminals. (Fig. 4.4.6-2) 
  (Fig. 4.4.6-2) 
CT1 input terminals 
Power supply 
CT 
Heater 
13
14
Power supply 
CT1 
Heater 
13
ガ
ス
ケ
ッ
ト 
14
15
ガ
ス
ケ
ッ
ト 
R 
S 
T 
CT2 
CT1 input terminals 
CT2 input terminals 










