Item Brochure

LINEAR PLANTING DETAILS
6
LINEAR INSTALLATION INSTRUCTIONS
A. CURB AND GUTTER
Typical section of curb and gutter with DeepRoot Tree
Root Guide inset into concrete.
Guide is installed in a trench in subgrade which is then
compacted. Guide is set so that top edge will be 2" (5cm)
below finish grade of curb and set flush with edge of curb.
Vertical ribs face toward tree roots.
INSTALLATION INSTRUCTIONS:
1. Prepare base and subgrade.
2. Trench to appropriate depth for installation so that top
of barrier is 2" (5cm) below finish grade of top of curb.
3. Place tree root guide in trench. Vertical ribs must face
toward tree roots.
4. Backfill and compact to requirements.
5. Place form material against guide. (It may be nailed from
the outside of the form.)
B. SIDEWALK
Typical section of sidewalk with DeepRoot Tree Root
Guide inset into concrete.
Guide is installed in a trench in subgrade which is then com-
pacted. Guide is set so that top edge will be 2" (5cm) above
compacted rock, gravel or sand (or halfway between rock
and finish grade of SW). Vertical ribs face toward tree roots.
INSTALLATION INSTRUCTIONS:
1. Prepare base and subgrade.
2. Trench to appropriate depth for installation of root
guide so that top of guide is 2" (5cm) below finish grade
of sidewalk (or halfway between top of compacted rock
and finish grade of SW).
3. Place tree root guide in trench. Vertical ribs must face
toward tree roots.
4. Backfill and compact to requirements.
5. Place form material against guide. (It may be nailed from
the outside of the form.)
4VCHSBEFDPNQBDUJPO
5ZQJDBM%FFQ3PPU6#
PQUJPOBMVTFPG6#
$PNQBDUDSVTIFESPDL
HSBWFMPSTBOE
"
4VCHSBEFDPNQBDUJPO
5PQPGCBSSJFSNVTUCF
DNCFMPX
àOJTIHSBEFPGDVSC
$PNQBDUDSVTIFE
SPDLHSBWFMPSTBOE
$PODSFUF
5ZQJDBM%FFQ3PPU6#
PQUJPOBMVTFPG6#
"
%FFQ3PPU6#
6#PS-#
NN
5PQPGCBSSJFSNVTUCF
DNCFMPXàOJTI
HSBEFPGTJEFXBML