User's Manual
Manuals
Brands
Shenzhen Power-way Information Technology Manuals
Office Electronics
AI Attendance Machine
14
15
16
17
18
19
20
21
22
23
Table Of Contents
1. Matters needing attention
2. Access control related diagram
2.1 Product Wireframe
2.2 Hardware interface description
2.3 Access control wiring diagram
3. Local background installation
3.1 Installation instructions
3.2 Access control device connected to the background
4.Wisdom building background instructions
4.1 Admin Login
4.2 Personnel
4.3 Area Manage
4.4 Device Manage
4.5 Run Water Record
4.6 Fight Manage
4.7 Group Setting
4.8 Attendance Statistics
4.9 Version Manage
4.10 temperatureStatistics
4.11 TemperaturelLoglist
This
equipment
meets
the
exemption
from
the
r
outine
evaluation
limits
in
section
2.5
of
RSS-102.
I
t
should
be
installed
and
operated
with
a
minimum
distance
of
20cm
between
the
radiator and any
part of your body
.
1
...
...
21
22
23