User Manual
Shenzhen Lean Kiosk Systems Co., Ltd
6 Add: Fu'an Industrial Area, Dayang Road, Fuyong Town, Baoan District, Shenzhen, Guangdong Province, China.
Stock Code
:
870885
▶Drainage System: Since the air conditioner and dehumidifier inside the kiosk will discharge a small amount
of water from the bottom during the operation, the ground installation platform for the kiosk must be designed
and reserved smooth drainage holes in advance.
Mounting Instructions for the Kiosk Base
Post Kiosk will be installed on the street for use, and it should be installed on solid and reliable concrete
ground. The base with the power cord through must have reliable insulation and waterproof treatment, the
drainage hole under the base must be kept free for a long time and not easy to plug; If you have any question
during the installation, please contact LKS after-sales technical staff.
Warning:Since the onsite construction and installation of the kiosks involves drilling, grooving, wiring,
high-voltage cable wiring, the construction personnel must have professional electrician certificate and
operate in strict accordance with the "electrical safety technical operation procedures". Also, they need to do
personal safety protection measures before starting to construct and install the kiosks.