User Manual

Shenchen Pump AMC Series
- 2 -
hexagon socket flat head screws(M4) to fix the pump head. The mounting
holes is on the back board.
Fasten the screws with a hexagon spanner.
2.2 Tubing Installation
1. Pressing elastic locking
arm mechanism to open
cartridge.
2. After the cartridge take off,
install tubing, two adjacent tube
clamps determine a working
position.
3. Install the cartridge to the
pump head, make it into the
working position.
4. Pull the lever to fix the
cartridge on the pump
head.
5. Installation finished.
Turn the knob to adjust the
pressure tubing gap
according with tubing size.
Note: It is forbidden to run the pump head without tubing.