User Manual
Table Of Contents
- Please read the manual carefully before operating the product.
- Tubing may have cracks due to wear, which results in overflow of fluid from the tubing. In that time human body and instruments may be harmed. So, users must check frequently and change the tubing in time.
- Please stop pump head rotating when replacing the tube or changing the tube position, otherwise it may cause fingers or clothes got caught.
- There are moving parts of the pump head inner, before opening the upper block, it must be carried out according to the following requirements:
- Ensure the pump is isolated from the main power supply.
- Ensure there is no pressure in the tubing.
- If the tubing has defects, ensure the liquid in the tubing is discharged to other containers or drain tubing.
- If transferring dangerous liquid, the user must wear protective clothing and eye protection.
- 1. Product Introduction
- 2. Pump Head Instruction
- 3. Dimension Drawing
- 4. Pump Head Technical Specification
- 5. Function Instruction
- 6. Troubleshooting
- 7. Maintenance
- 8. Warranty and After Service
Shenchen Pump AMC Series
- 2 -
hexagon socket flat head screws(M4) to fix the pump head. The mounting
holes is on the back board.
Fasten the screws with a hexagon spanner.
2.2 Tubing Installation
1. Pressing elastic locking
arm mechanism to open
cartridge.
2. After the cartridge take off,
install tubing, two adjacent tube
clamps determine a working
position.
3. Install the cartridge to the
pump head, make it into the
working position.
4. Pull the lever to fix the
cartridge on the pump
head.
5. Installation finished.
Turn the knob to adjust the
pressure tubing gap
according with tubing size.
Note: It is forbidden to run the pump head without tubing.