Instructions / Assembly

Page 4
STEP 6: INSTALL WIND BRACES
Fig. 6
STEP 7: INSTALL TOP RAIL
Fig. 7
STEP 5: INSTALL SIDE RAILS AND
SHELTERLOCKā„¢ STABILIZER BLOCKS
Fig. 5
Install the Top Rail
OVER all Middle Ribs
UNDER First & Last Ribs
Fig. 7
With help move the first end rib into the desired staked area. Place
the ShelterLock on the upright as shown in Fig. 5. From the outside
of the rib insert the bolt through the upright and then through the
ShelterLock. Place the plain end of the side rail over the bolt and
nest it into the ShelterLock. Install the nut onto the bolt and tighten.
Repeat these steps for the opposite side and all of the remaining ribs.
The side rails for the last rib will have two plain ends.
Take the wind brace and attach it between the end rib and the
first middle rib as shown in Fig. 6. Any attachments at the
cross rails should be made on the very inside of the cross rail.
Place the first top rail under the end rib and secure it with a bolt as shown in Fig. 7.
The same cross rail should lay on top of the first middle rib as with all of the middle
ribs. Secure the rails to the frame with the hardware indicated in Fig 7. The top rail
attached to the last rib will be installed under the pipe as the initial end rib.
Wind Brace
End Rib
Wind Brace
Fig. 6
Wind
Brace
Wind
Brace
11102
11102
11102
11102
Fig.5
800454
800372
690
11102
11102
669
11005-11179
11005-11179