22'W x 13'H Peak Style Shelter Frame Assembly Instructions Recommended Tools Please read instructions COMPLETELY before assembly. This shelter MUST be securely anchored. THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE. Before you start: 3+ individual recommended for assembly.Assembly time is dependent upon the size of your building. Allow approximately 15 minutes for every foot in building length. 1-800-524-9970 Canada: 150 Callender Road Watertown, CT 06795 www.shelterlogic.
ATTENTION: This shelter product is manufactured with quality materials. It is designed to fit the ShelterLogic®, LLC custom fabric cover included. ShelterLogic®, LLC Shelters offer storage and protection from damage caused by sun, light rain, tree sap, animal - bird excrement and light snow. Please anchor this ShelterLogic®, LLC structure properly. See manual for more anchoring details. Proper anchoring, keeping cover tight and free of snow and debris is the responsibility of the consumer.
22'W x 13'H Peak Style Frame Assembly Please read and understand instructions completely before assembly. 107153 Lay out frame parts as shown. Top Rail Middle Ribs End Rib End Rib Wind Brace Cover Rails Side Rails Wind Brace Assembly Reference # 1 2 3 4 5 6 7 8 9 10 11 12 13 Mfg. Part # 11135 11136 11013 11016 11019 11068 11095 11101 11102 11103 11104 11105 11106 Assembly Reference # 14 15 16 17 18 19 20 21 22 23 24 25 Mfg.
Basic Frame Assembly NOTE: FRAME EXTENSION KIT 22'x20'x13' is the base frame dimension. Your model may have more middle ribs than shown in the illustration on pg.2. You will receive one extra rib for every extra 4 ft. of building length that you purchase. The basic frame assembly will remain the same. The cover will be the correct size for the length of the building 22 ft. WIDTH 1. Plotting THE Frame: Before building your shelter, you should choose a flat area on your property and plot your shelter. 1.
. CONNECT RIBS WITH Side Rails and ShelterLock™ Stabilizer Blocks: Fig.5 A. Place assembled first end rib in the staked area. Place the ShelterLock™ on the upright as shown in Fig.5. From the outside of the rib insert the bolt through the upright and then through the ShelterLock™. B. Place the plain end of the side rail over the bolt and nest it into the ShelterLock™. Install the nut onto the bolt and tighten. Repeat these steps for the opposite side and all of the remaining ribs.
8. Sliding cover rail assembly: 11105 A. Place a Cover Rail Pipe (11105) between each rib. Use 2 Rail Clamps (11106 or 11107) to attach each end of the pipes. B. Use Bolt #11130. HAND-TIGHTEN these bolts only! NOTE: Round head of carrage bolts should be facing outside. End Rib Cross Rail Clamps 11106 11130 Fig.8 Middle Rib Cross Rail Clamps 11107 00690 11130 11105 11105 00690 11105 Fig.9 9. Squaring up the Frame A.
11. END and Door panel installation A. Hold end panel at the top center with white inner surface facing inside of the shelter. (If you purchased the white cover, the inner face has the visible weld seams.) Wrap the edges of the fabric panel around the end rib. B. Disconnect top cross rail (the horizontal pipes that run from front to back along the top) from the end rib. Pull the webbing (the black strap) below the cross rail. Reattach the top cross rail to the end rib.
12. Installing the Cover on the Frame 1. Lay the cover on the ground next to the frame with the inside of the cover (the side with the pipe pockets) facing down and the webbing on the front and rear of the corner of the building. Position the cover so that it is centered on the frame, front to back. Fig. 12A 2. Fold over the side closest to the frame so the pipe pocket is now accessible.
13. INSTALLING COVER AND COVER RAILS A. Lay the cover on the ground next to the frame with inside of the cover (the side with the pipe pockets) facing down and the webbing on the front and rear of the corner of the building. B. Pull cover over the frame, making sure to center cover on frame. There should be an equal amount of over- hang at all four corners. C. Insert the “S”- Hook on ratchet into hole on the leg bend. Insert the webbing into the spindle of the ratchet and pull tight.