Installation Guide

05_10077-00800_E2Page 2
Shelter Width Door Width Number of Poles
6 ft. 4 ft. 1 Swedged Poles + 1 Plain Pole
8 ft. 6 ft. 2 Swedged Poles + 1 Plain Pole
10 ft. 8 ft. 3 Swedged Poles + 1 Plain Pole
12 ft. 10 ft. 4 Swedged Poles + 1 Plain Pole
14 ft. 12 ft. 5 Swedged Poles + 1 Plain Pole
A. Measure width of door between the zippers to determine size.
B. Slide pipes into one another to assemble.
NOTE: For added weight, ll pipe with sand and insert plugs.
C. Slide pipe into pocket at bottom of door.
Attach buttery cleat with screws to second vertical rib, about 8 inches down from cross rail on either side.
2. ATTACH BUTTERFLY CLEAT TO INSIDE OF SHELTER FRAME
3. ATTACH ROPE ENDS TO OUTSIDE OF SHELTER COVER
1. ASSEMBLE PIPES FOR BOTTOM POCKET OF DOOR.
Shelter Cover Exterior
Door Panel Exterior
Width
Between
Zippers
A. Cut a small slit/hole, approximately 18 inches in from zipper, on the outside of the cover, just
above the webbing rope. Do this on both sides.
B. Tie a knot around the cover webbing through the hole in the cover.
Approximately
18"
Buttery Cleat
Tie Knot
Rope
Cover
Door Panel