ShelterIt™ 10'x10'x8' Instant Shelter INSTRUCTION MANUAL # 71010 Parts Alert! If you have a question or if there are missing parts, please call: 203-591-9032 or email Service@shelterit.com Monday-Friday 9:00am-5:00 p.m. EST Missing parts will be sent to you via courier. Visit ShelterIt.com for instructional video DO NOT RETURN TO STORE! Please read instructions fully before beginning assembly Visit Shelterit.
TABLE OF CONTENTS SAFETY CAUTIONS…….....................................................3 PARTS LIST.........................................................................4 ASSEMBLY INSTRUCTIONS.............................................5-13 PARTS SCHEMATIC...............................................................6 LIMITED WARRANTY...........................................................
onto the shelter. 4. Inventory all parts before attempting installation. 5. Always wear safety glasses and gloves when assembling or disassembling this product. 6. The shelter must be Installed on a level surface. 7. Anchors must be used with all shelters. When erecting shelters, covers should NOT be installed on any product until it has been properly anchored to the ground. Any shelter that is not anchored securely or properly will blow away.
PARTS LIST 10x10x8 -4-
Visit Shelterit.com for installation Video Diagram A below represents the completed Frame Assembly once steps 1- 4 are completed. Note: 2 or more people are required for safe and accurate assembly.
Step 3: Assembling the Roof Connect all parts as shown in Diagram D to form the peak of the shelter frame. Use bolts #19 and nuts #18 to assemble the roof together. Install all carriage bolts with nuts facing into or toward the center of the frame. Assembly Tip: Using a hammer, tap the bolts to wedge them slightly into the opening. When tightening the self-locking nuts, ensure to draw the bolt heads into the holes of the pipe so that the head of the bolt when fully tightened is flush with the pipe.
Use a rubber or wooden mallet to ensure all pipes are fully inserted. Step 4: Attaching the Legs a. Assemble the six legs: There are four corner legs and two center legs. Please refer to Diagram F. The corner legs are assembled by combining parts #1, #2 & #3. The center legs are formed by connecting parts #1 & #4. Assembly Tip: Square dents in pipes #1 and #2 are to face downward to provide a pressure fit with the next pipe. b.
Step 5.
-9-
INSTALLING THE FRONT AND BACK PANEL Starting from the peak, disconnect the Cross Rail from the 3-way top connector. Place exposed Rope at the top of the panel over the 3-way connector and under the cross pole as shown in Detail P above.. At each corner remove the Cross Rail and pull the door fabric around to the inside, placing the 3-way connector through the opening in the fabric as shown in Detail O. Reconnect the cross rails. Find the corner upright with the holes below to the yellow….. sticker.
This will tighten the doors to the frame. After making the door snug Detail 19 22 & 28 You can pull all around the inside corners of the door too even the door on the frame. The bottom of the door should be just above the eye hook and above the bottom corner leg This will insure the door will not rub on the ground and wear it out Detail 23. Pull up on the rope again so the door is tight on the frame and tie a few knots to secure the rope Repeat the same for the back panel. Visit Shelterit.
Step 6. Installing the Covers Installation Tip: Visually check all pipes of the frame to ensure they are fully inserted into the next pipe before installing cover. Pipes may separate during installation of end covers and prevent proper installation of the main cover Two people, each positioned approximately one-third into the center of the cover, carefully pull the cover over the frame. When reaching the peak use a step stool or ladder to pass over this height.
Step 7: Installing Lower Cross Rails into the main cover The shelter cover is manufactured with heat-welded pipe pocket sleeves along the lower wall of each side (white color faces inside the shelter, Disconnect the lower cross rails and clamps and insert the cross rails in the pockets of the cover and reassemble the clamps to the frame hand tight. Both sides of cross rails on the shelter should be approximately equal heights from the ground.
- 14 -
Visit Shelterit.com for installation Video Cover Tensioning Find the ropes coming out of the 4 corners of cover with the big loops with yellow……label You will see 2 red….. labels on the rope before the big loop Detail 20 & 24 Hook the cover rope that has the 2 red …... labels in the same eye hook that you used for the door on the outside of the shelter Detail 20 After hooking to rope to the eye hook with red ….. label , bring the rope under the door Detail 23 Hook the big loop with the yellow…...
Step 8: Square and Anchoring the Shelter a) Ensure the frame is in the final desired location. b) Check the measurement of 12’ in the front and back of the shelter. c) Take a diagonal measurement, cross-corner to cross-corner. When these two measurements are equal the shelter is square. If not equal, tap the corner leg of the longer measurement with the rubber mallet, in the direction of the diagonally opposite leg to push (decrease) the length of the distance.
LIMITED WARRANTY This product is guaranteed for 1 year from the date of original retail purchase against defects in materials and workmanship. Subject to the conditions and limitations described below, this product, must be returned with proof of purchase within the stated warranty period and if covered under this warranty, will be replaced (fully or partially with the same model or one of equal value or specification) at the Manufacturer’s option.