Installation Guide

INSTALLATION
14. Protect all exposed edges of the ooring by installing wall molding and/or transition strips. Make sure that no plank will be
secured in any way to the sub oor.
15. For wet areas such as bathrooms caulk the perimeter of the oor with a silicone caulk.
16. Protect the nished ooring from exposure to direct sunlight to reduce fading and thermal expansion.
17. Do not use tape to secure oor protection during construction or renovation.Use ram board or similar to protect the
oor.
4
shawoors.com
For reference purposes only if printed or downloaded. Revision: 03182020