Installation Guide

INSTALLATION
Never use solvents or citrus adhesive removers to remove old adhesive residue. Solvent residue left in and on the suboor may affect the new oor
covering.
This product can be installed over existing ceramic/porcelain tile products with up to a 1/4 inch wide grout joint. If the grout joint width exceeds 1/4 inch,
a cementitious patching compound should be used to ll the grout joint to make it smooth with the surface of the tile.
RAISED ACCESS PANEL SUBFLOORS
Raised access panels must be stable, level, at, free and clean of existing adhesives
24" x 24" panels are recommended.
Lippage (variation of height) between of panels must notexceed 0.295” (0.75 mm)
Gaps between panels must not exceed 0.039 (1mm)
There should be no deection of the individual panels – Concave less than 0.0295” (0.75 mm)
Flatness 1/8” in 10’
Stagger the ooring tiles/planks to overlap the access panels
Telegraphing of access panel seams may be visible and is not considered a product defect nor warranted by the ooring manufacturer.
If needed overlay the panels with a ⁄” (6 mm) plywood and properly fasten to the access panels prior to the installation of the
oorcovering. Prior to underlayment installation, repair any loose or unstable panels. Use the appropriate installation
methods for the product.
III. INSTALLATION
Tools: Tape Measure, Utility Knife, Jigsaw, Tapping Block or Rubber Mallet, Pull Bar, 1/4" Spacers, T-Square, Safety Glasses,
Broom or Vacuum and, if necessary, tools for suboor repair.
Installation of 6 mil Poly Film Underlayment is recommendedfor oating methodonly in high moisture applications.
For use over concrete substrates - seamsMUSTbe taped.
Optionalover wood substrates – doNOTtape seams.
Begin at the starting wall. Roll underlayment out parallel to the starting wall and allow the poly lm to run 2 inches up the wall.
After the ooring has been installed trim back the poly lm from the wall.
Roll the next course of poly lm parallel to therst run and overalap a minimum of 4 inches. Smooth out any wrinkles or creases in the poly lm.
Usecleartape to tape the seams together when installed over concrete substrates.
Continue to install the ooring over top of the poly lm taking carenot to damage the poly lm.
Note:Do not cover the entire area of the substrateto prevent damage or presentaslip hazard. Roll the poly lm out one row
at a time.
Floating Installation
SPC plank ooring is designed to be installed utilizing the oating method. Proper expansion space 1/4” (6.35 mm) is required.
Undercut all doorjambs. Do not fasten wall moldings and or transition strips to the planks.
Glue Down Installation: SPC products are approved for glue down installation over approved wood and concrete substrates.
Follow adhesive label application instructions. Install ooring into wet adhesive to achievea permanent bond. Maintain 1/4”
(6.35 mm) perimeter expansion space. Refer to adhesive label for moisture limits of the adhesive.Roll ooring immediately
after installation with a 100 lbs. 3section roller.
Recommended Adhesive(s):Shaw T-180 or comparable adhesive
Tile patterns must be installed in a staggered (offset) brick pattern. Minimum 1/3 offset 1/2 offset is preferred.
3
shawoors.com
For reference purposes only if printed or downloaded.