Installation Guide


AselflevelingPortlandbasedunderlaymentmaybeappliedoverit.
Checkwiththeunderlaymentmanufacturerforsuitability,
applicationinstructionsandwarranties.
b. Neverusesolventsorcitrusadhesiveremoverstoremoveoldadhesive
residue.Solventresidueleftinandonthesubfloormayaffectthenew
floor
covering.
5.SHAWADHESIVES
SHAW200TPS,S150,4100
Shaw200LuxuryVinylTile&PlankAdhesiveisanadvancedresinbased,cross
linkingpressuresensitiveadhesivefeaturinghighaggressivepeelandshear
strength.Thissolventfree,nonflammable,easytrowelingproductprovides
excellentinstallationforluxuryvinyltileand
plankoverbothporousandnon
poroussurfaces.RecommendedtrowelsizesforusewithShaw200adhesive
are:
Poroussubstrates:1/16x1/16x1/16sq.
Nonporoussubstrates:1/16x1/32x1/32U
SHAWS150‐universalaerosolsprayadhesive.
ShawS150aerosolsprayadhesiveisawaterbased
aerosoladhesive
recommendedforinstallationsofvinylsheet,plankandtiles,vinylcomposition
tileorcovebaseoverporousandnonporoussubstrates.
SHAW4100solventfreeresilientsheet,plankandtileadhesive
Shaw4100solventfreeadhesiveisaninstallerfriendly,premiumhighstrength
(nonstaining)acrylicadhesive,designed
topermanentlyinstallSHAWflooring.
SHAW4100maybeusedonallgradesofconcreteon,aboveorbelowgradein
theabsenceofexcessmoisture,aswellassuspendedapprovedwoodfloors.
SHAW4100isnonflammable,water(90%RH)andalkali(10pH)resistantand
freezethawstable.
SHAW4100hasexcellentresistancetoplasticizermigration
andsetstoatoughpermanentbond.Zero(calculated)VOC’s.CRIGreenLabel
PlusApproved.
6.INSTALLATIONOFVERSAFIT™
a. Materialshouldalwaysbevisuallyinspectedpriortoinstallation.Any
materialinstalledwithvisualdefectswillnotbeconsideredalegitimate
claim
asitpertainstolaborcost.
b. WheninstallingVersaFitplankproductsyoushouldmixplanksfrom
severalcartonstoblendminorshadevariations.
c. Flooringandsubfloorroomtemperatureshouldbebetween65and85
Fahrenheit.Maintainpropertemperaturefor48hoursbeforeandafter
installation.Afterthat
maintainaminimum55degreetemperature.The
building’sheatingandairconditioningsystemshouldbeturnedonatleast
oneweekbeforeinstallation.Failuretofollowtheseguidelinesmayresult
inaninstallationfailure.(i.e.flooringmayexpandorcontractresultingin
gapping)
d. VersaFitplankshouldbeinstalledtight
tothewall.Ifthiscannotbe
accomplishedyouwillneedtosecuretheplankstotheflooraroundthe
edgesusingSHAW200tpsadhesive,ShawS150sprayadhesiveora
suitableDS/PS(doublesided/pressuresensitive)tape.
e. Inareasthattherewillbeheavyrollingloads
orwherecastersarenot2”
youmayneedtoapplyanadhesive(SHAW200orSHAWS150)ordouble
face/pressuresensitivetapeundertheplankstopreventtheplanksfrom
gappingandlifting.
f. DonotinstallusingthelooselaymethodoveranunderlaymentYou
mustuse
thefullspreadmethod.
LAYOUTOFTHEROOM
Beforelayingoutthefloor,checkthewallyou arestarting fromandmak esureit
issquaretotheoppositewall(planksshouldrunlengthwiseagainstthelongest
wall,andifpossible,paralleltoincomingsunlight).Simplymeasuretheroom
fromoppositeendsofthewalltothefarwall.Ifthemeasurementsaredifferent
youcanmakeadjustmentsonthefirstrowofVersaFitbyscribingtheplankon
theoveredge.Aswithallplankproductsitisbesttostartalongthelongest
exteriorwall.
The
widthofthefirstrowofplanksshouldbeapproximatelythesamewidthas
thelastrow.Thismayrequirecuttingthefirstrowplanktoashorterwidth.
Measureacrosstheroomininchesanddividebythewidthofaplanktosee
howmanyfullwidthplankswill
beusedandwhatsizewidthwillbeneededfor
thelastrow.Thelastrowshouldneverbelessthan2"inwidth.
Laythefirstrowofplanksouttodetermineifyouneedtoadjustthelengthof
thefirstplanktoavoidasmallpieceof
lessthan6”ontheoppositewallfrom
whereyoustarted.Wheninstallingtheplank,itisrequiredtostaggertherows
sothattheendjointseamsareaminimum6”apartandtheseamsarenotina
straightuniformline.Werecommendthestaggeredrandommethod.
Installation
shouldstartinacornerandproceedfromthatcornerworkingacross
theroommakingsuretothatyourendpiecesagainstthewallareaminimumof
6inchesandstaggeringtheendjointsaminimumof6inches.Theplanksmust
beinstalledtightagainstthewallsthroughoutthe
entireinstallation(ifthis
cannotbeachieveduseanapprovedlvtadhesiveorasuitableDS/PStape.).
FITTINGTHEBORDER:
Measurethedistancefromthelastplankintherowtothewall.Marktheplank
andcutitagainstthemark.Laytheplankinplace,makingsurethat
thecutedge
isagainstthewall.
FittingAroundIrregularObjects:Makeapatternoutofheavypapertofit
aroundpipesandotherirregularities.Placethepatternontheplank,trace
cuttingalongthetracelines
7.MAINTENANCETopreventindentationwerecommendthatyouput
protectivenonstaining
padsonthelegsofheavyfurniture(pi a nos,chairs,
tablesetc.).Alsoifyouhavefurniturewithrollingcasters,thecastersneedto
beaminimumof2”diameter.
8WARRANTY‐Forcompletewarrantyinformation,plea secallShaw
InformationCenter:1800.441.7429
Revision4_011216LD