Installation & Assembly

1.TESTBEFORESTARTINGINSTALLATION
Note:Allsubstratestoreceivemoisturesensitivefloorcoveringmustbetestedformoisture.
CONCRETESUBSTRATES:
AllconcretesubstratesshouldbetestedforIRH(InternalRelativeHumidity)accordingtoASTMF2170.
CalciumChloridetestsmaybeconductedinadditiontoIRHandmustbeperformedperthelate
ste
ditionofASTMF1869.
NEWANDEXISTINGCONCRETESUBFLOORSSHOULDMEETTHEGUIDELINESOFTHELATESTEDITIONOFACI302ANDASTMF710,“STANDARD
PRACTICEFORPREPARINGCONCRETEFLOORSTORECEIVERESILIENTFLOORING”AVAILABLEFROMTHEAMERICANSOCIETYFORTESTINGAND
MATERIALS,100BARRHARBORDRIVE,WESTC
ONSHOHOCKEN,PA19428;6108329585;HTTP://WWW.ASTM.ORG.
a. Substratesshallbesmooth,structurallysound,permanentlydry,cleanandfreeofallforeign materialsuchasdust,wax,solvents,paint,
grease,oils,oldadhesiveresidue,curingandhardening/curingcompounds,sealersandotherforeignmaterialthatmightprevent
adhesivebond.
b. Concretefloorsshallbeflatandsmoothwithin1/8"in6feetor3/16”in10feet.
c. FNumberSystem:Overallvalues
ofFF36/FL20maybeappropriateforresilientfloorcoverings.
d. MoistureVaporEmissionRate(MVER)ConducteitherinsituRHtest(ASTMF2170)orCaClMVERtestmethod(ASTMF1869)Referto
theadhesive
informationfortheacceptablemoisturelimits
e. UsecementitiouspatchingandlevelingcompoundsthatmeetorexceedShaw’smaximummoisturelevelandpHrequirements.Useof
gypsumbasedpatchingand/orlevelingcompoundswhichcontainPortlandorhighaluminacementandmeetorexceedthecompressive
strengthof3,00
0psiareacceptable.
f. PerformBondtestingtodeterminecompatibilityofadhesivetothesubstrate.Shaw9050primercanbeutilizedtopromoteadhesion.
g. Porositywaterdroptestwillhelpdetermine porosityifdropremainsonthesurfaceafter12minsconcreteshouldbeconsidered
nonporous.
h. Workingandopentimesofadhe
sivesmayvarybasedonjobconditions,substrate,temperature,andhumidity.
i. Areastoreceiveflooringshouldbeadequatelylightedduringallphasesoftheinstallationprocess.
j. Itisrecommendedthatresilientfloorcoveringinstallationshallnotbeginuntilallothertradeshav
ecomple
ted.
TEMPERATURE‐AMBIENT:
a. Controlledenvironmentsarecritical.FullyfunctionalHVACsystemsarethebestwaytoensuretemperatureandhumiditycontrol.
DONOTinstallresilientflooringproductsuntiltheworkareacanbetemperaturecontrolled.
ThepermanentHVACsystemturnedonandsettoaminimumof65°F(20°C)oramaximumof85°F,foraminimumof7days
priorto,during,andafterinstallation.Oncetheinstallationiscompletethetemperatureshouldnotexceed85°F.
PH:
ConcretefloorsmustbetestedperthelatesteditionofASTMF710.
PHreadingmustnotexceed10.0.
Readingsbelow7.0and inexcessof10.0affectresilientflooringandadhesivesnegatively.
Rinsingthesurfacewithclearwatermayloweralkalinity.“DAMPMOP”
Shaw9050anacrylicsolutioncanbeutilizedtocorrecthighPHreadings.
NOTE:ITMAYNOTBETHEFLOORCOVERINGINSTALLER’SRESPONSIBILITYTOCONDUCTTHESETESTS.ITIS,HO
WEVER,THEFLOORCOVERING
INSTALLER’SRESPONSIBILITYTOMAKESURETHESETESTSHAVEBEENCONDUCTED,ANDTHATTHERESULTSAREACCEPTABLEPRIORTO
INSTALLINGTHEFLOORCOVERING.WHENMOISTURETESTSARECONDUCTED,ITINDICATESTHECONDITIONSONLYATTHETIMEOFTHETEST.
2.MATERIALSTORAGEANDHANDLING:
a.
Flooringmaterialandadhesivemustbeacclimatedtotheinstallationareaforaminimumof 48hourspriortoinstallation.
b. Storecartonsoftileorplankproductsflatandsquarelyontopofoneanother.Tileorplankproductsshouldbestackednomorethan6
highandallowforairflowaroundstac
kswhenunpalletized.Preferably,locatematerialinthe“center”oftheinstallationarea(i.e.away
fromvents,directsunlight,etc.)Storingcartonsindirectsunlightmayaffectproperacclimationbyinducingthermal
expansion/contraction.
c. Whenpalletizingonajobsitevinylplankorti
lesneedtobestacked2
rowshighsidebysidewithnoairspacebetween.Thenquarter
INSTALLATIONGUIDELINESFORLUXURYVINYL
PLANKANDTILE
For reference purposes only if printed or downloaded.

Summary of content (7 pages)