External Access Panel
( 7, Phillips Head Screws)
To run the main 240 volt supply wiring, remove the outer ac-
cess panel and seven phillips head screws. Carefully slide the
panel up and out.
The electrical compartment has a separate cover panel. Re-
move it by loosening the 5/16 inch, hex head screws on the
bottom of the panel. Slide the panel down then guide one cor-
ner out from behind the body cabinet corner post.
Connect the proper conduit to the 3/4 inch electrical port shown
below. Run wire of the proper size allowing enough slack to
wire tie the supply line inside the cabinet. Run the wire up
through the provided knock out on the bottom of the high volt-
age compartment. All conduit connections should be 3/4" and
water tight.
3/4" Electrical
Knock-Out for Incoming
Supply Wiring
Field Installed High Voltage
Supply Wire w Ground
in 3/4" Conduit
See Wire Size Requirements
220V Field Connection Here
at Line Side (Top) of "Main Contactor"
External
Pool Steel Bond
Wire Lug Here
(side of unit)
27
Internal Electrical
Compartment Cover
2, 5/16" Hex Head Screws
ELECTRICAL ACCESS & WIRING
Factory Wiring from
Load Side (Bottom) of Main
Contactor to Compressor
Do Not Change !
Internal
Ground Lug
3/4" 90˚
Electrical
Fitting
WARNING
The heater must be electrically grounded and bonded in accordance with local codes, or in the absence of local codes,
with the latest national electrical codes ANSI/NFPA No. 70. All wiring must comply with all local codes, or in the
absence of local codes, with the latest national electrical codes ANSI/NFPA No. 70. For proper wire and/or breaker
size, please refer to specification sheet and your local licensed electrician.
WARNING
Shut main power disconnect
"OFF" before removing
access panels.
!
!