Service manual

UX-465L/C
UX-485LU
8 – 2
2. Description
2-1. Relay board unit
1. Remove the TEL/LIU PWB, control PWB and Power Supply PWB
from this unit, and mount the relay board unit instead.
Before connecting the wiring to the relay board unit, set the test
PWB switches to the fixed position.
2. The setting is as follows.
The hook switch are operated by OR of the mechanical unit switch and
the test PWB switch. When performing installation in the machine unit,
set the test PWB switches to the fixed position.
Mechanical unit PWB to be tested
Actual operation with mechanical unit
PWB sensor check
POWER
SUPPLY
PWB
CHECK
TEL/LIU
PWB
CHECK
CONTROL
PWB
RELAY CABLE
DON'T SEPARATE
UNIT
NOTE
PAPER SENSOR RELAY CABLE (QCNW-4969SCZZ)
TO
CHECK
PWB
TO
EXTENSION
PWB
+5V(J13)
DG(J5)
P-E(TP2)*
P-IN(TP3)
RBNSNS
DRSNS
(TEL/LIU)
(TEL/LIU)
(TEL/LIU)
(TEL/LIU)
(CONTROL)
(CONTROL)
WHITE
BLACK
BROWN
RED
ORANGE
YELLOW
* P-E is not used.
ON/OFF operation
ON-HOOK
ON/OFF operation
Hook SW ON-HOOK
Hook SW
Relay
cable
CNLIUA
CHECK
CONTROL
PWB
CHECK
TEL/LIU
PWB
1
14
CNPW
CNLIUA
POWER
SUPPLY
PWB
The relay cables are used as one pair.
The cover swtich and hook switch are manually operated.
The recording paper sensor(P-E) is not used.
CN1