Product specifications

COMMUNICATIONS
Sharp Electronics Corporation
Section-5: MWS Connection using the Inline System
Prior to programming, it is important to insure that the hardware connections necessary for
each terminal are accomplished. As a basic rule, the following steps may be used for the
UP-800 connection to an Inline system:
1. Connecting the UP-800:
Procedure:
1. Connect the specified LAN cable to the Ethernet port marked “LAN”
2. Install a ferrite core (part no. RCORF6699BHZZ) within 3 cm of the connector on the
connection cable to reduce interference
2. Cabling Specifications:
The cabling for the MWS specification is the same as for the Inline system. Please refer to
Section 5: Inline for information for the cabling specifications.
3. Related Programming Jobs - MWS:
Once the Inline system has been properly configured, to determine the MWS settings,
please refer to the PGM2- mode reading as outlined below:
Program Readings
PGM Menu Main Menu
PGM2 Mode 18 MWS READING
Procedure:
Enter PGM2-Mode by pressing the MODE key and selecting 6 PGM2 MODE
Select [18 MWS READING]
Select [1 DISPLAY] to view the report on the touch-screen, or select [2 REPORT
PRINTER] to generate a hard copy of the report.
Usage Method: The resulting report will provide the settings for the MWS IP
ADDRESS and a Gateway IP ADDRESS, which may be used when the Inline system
is an extended LAN.
Page 178 of 246