Operating instructions

4.3.1 Required jobs and checks
The following maintenance schedule is based on max. 3000 service hours per
year.
Reduce the intervals if this number is exceeded.
Daily
1 Chamber + heat exchanger
General visual inspection
Clean components if necessary
Change defective components immediately.
2 ID fan + flue gas pipe
General visual inspection
Clean components if necessary
Change defective components immediately.
3 Combustion air blower fan
General visual inspection
Clean components if necessary
Change defective components immediately.
Weekly
4 Geared motors
Visually check all geared motors for oil leaks
5 Heat exchanger ash removal (not pictured)
Check the ash level
Check for unburned material and foreign bodies
Empty ash container if necessary
6 Chamber ash removal
Check the ash level
Check for unburned material and foreign bodies
Empty ash container if necessary
4
Servicing
Maintenance schedule
30 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com