Instruction manual

Installation
Setup
2-10 Model 5030i SHARP Instruction Manual Thermo Fisher Scientific
nephelometer zero should be conducted. After re-zeroing the nephelometer,
repeat the zero check steps above.
Setting up this monitor includes siting the monitor per local government
agency requirements, creating a waterproof inlet system installation with
vertical support, connecting the inlet system to the instrument through the
dynamic heater system, connecting vacuum lines, establishing datalogging
setting, and making the power connections.
When siting the inlet system, it is best to first establish the instrument
location and height within the air monitoring station. From whatever
chosen surface the instrument is to rest on (rack or table top), add
approximately 24 inches to that height to allow for overall height of the
5030i monitor.
Next allow approximately 40 inches to attach the heated sample tube to the
top of the 5030i via 5/8-inch OD tubing unions that use Teflon ferrules.
Figure 2–3. Model 5030i Side View—inches [millimeters]
It is also important to locate the roof flange installation in vertical
alignment with the inlet of the instrument. By reviewing the top view
drawing of the instrument (Figure 2–3), the roof flange must be centered
in direct alignment with the 5/8-inch OD tube entering the 5030i
instrument.
Setup
Inlet System