Instruction manual

Installation
Acceptance Testing and Startup Procedures
2-4 Model 5030i SHARP Instruction Manual Thermo Fisher Scientific
program. Furthermore, it is an opportunity to assure that the monitor is
operating according to the manufacturer specifications.
After acceptance testing, a completed monitoring installation will require
final volumetric flow rate verification.
Prior to installing the Model 5030i, you should perform the acceptance
testing procedures. These tests are conducted to evaluate the out-of-box
performance of the instrument, perform any necessary calibrations prior to
final site installation, and familiarize the user with the menu structure.
Use the following procedure to perform the bench acceptance test.
Equipment Required:
Model 5030i
Power Cord
Ambient Temperature/RH Cable Assembly
Vacuum Pump Assembly
Flow Adapter Assembly
NIST-traceable Thermometer
NIST-traceable Hygrometer
NIST-traceable Barometer
NIST-traceable Manometer(s)
NIST-traceable Volumetric Flow Transfer Standard
(Do not use the heated sample tube assembly at this point.)
1. After unpacking the instrument place the Model 5030i and accessories
onto a table or bench located within a stable indoor environment.
Remove the side-panel cover and inspect the filter tape. Leave cover
OFF until after acceptance testing has been completed.
Note Prior to continuing with acceptance testing, the instrumentation and
accessories should have sufficient time to equilibrate to room temperature
due to temperature variations during shipping and/or storage.
2. Following a sufficient equilibration period, connect the power cord to
the rear of the instrument and to a properly grounded power supply.
Acceptance Test