Operation Manual
Table Of Contents
- Introduction
- Installing/Launching
- Setting Up a Server
- Launching
- Creating/Editing Programs
- The main Program Editor window
- Creating programs
- ● Valid content files
- ● Positioning content (Layout)
- ● Setting the background/frames 1-4
- ● Setting the scroll message
- ● Setting audio and music
- ● Setting the PIP window
- ● Saving a program
- ● Opening a program
- ● Checking a program
- ● Deleting a program
- ● Displaying program properties
- ● Importing/exporting a program
- Setting Information for logging in to the management PC
- Uploading/Downloading Programs, Content and Scroll Messages
- Deleting Programs, Content and Scroll Messages on the Server
- RSS Editor
- Conditional Content
- Creating/Editing Timetables
- Creating/Editing Schedules
- Logging In
- Panel Management
- Distributing
- Management
- User Management
- Viewer Update
- Schedule Reception/Program Display
- Key/Mouse Monitoring
156
FTP Server/Client Scheduler
•
[Register/UpdatethisPCtoManagementPC]
Click the button to send the viewer PC information to the management PC. You can easily register the
viewer PC information to the management PC.
[Panel Control] tab
Selectthepanelcontrolmethod(RS-232C/LAN).
• “Nopanel”optionbutton
Panels will not be controlled.
• “Singlepanel”optionbutton
Click [Connection Setting] and select the panel control
method(RS-232C/LAN).
• [ConnectionSetting]
Selecteither“RS-232C”or“LAN”fromthe[Connectinginterface]optionbuttons.
Setting Description Default
RS-232C
COM port COM1~COM256 COM1
Baud Rate 9600,19200,38400 9600
LAN
Host name or IP
address
Enter the host name or the IP address of the panel to be
controlledwithin32alphanumericcharacters.
-
Data port
Enteradataportnumberbetween1025and65535forthe
panels to be controlled.
10008
Username
Entertheusername,ifoneexistsforthepanelstobe
controlled,in8charactersorless.
-
Password
Enterthepassword,ifoneexistsforthepanelstobe
controlled,in8charactersorless.
-
• [Testconnection]
Checktheconnectiontoconfirmthatthepanelcanbecontrolled.Aftertheconnectionisestablished
successfully,themodelnameofthepanelisacquiredanddisplayed.Performoperationwiththe
powerofthepanelturnedon.TocontrolthepanelwiththeLB-1085,besuretochecktheconnection
once. The panel cannot be controlled unless a “Test connection” is performed.










