Case Study Smart Chap Installation of the modular Energy Management System in a commercial building Installation via our Partner: Green SA www.green.be www.sharp.
Green SA For more than 10 years, Green is acting as an engineering, procurement, and construction company in the renewable energy sector. With Eutronix, Green is acting as a consultant to find the best solutions to be “more green” at a reasonable cost. System setup Installation at Eutronix in Belgium PV System System size: 384x255Wp Total : 97.920Wp Inverter: SMA STP 20000 Battery System (Retrofit) www.sharp.
The challenge Eutronix (www.eutronix.eu) did not use a significant part of the electricity produced by the solar panels during daytime, while the consumption was high at night because of the data servers. The battery system offers the possibility to use the surplus of green electricity to power the data servers part of the night. During summer and half of spring and autumn, batteries are very often full before noon.