Specifications
Stages in milling and drilling
60 ProtoMat 95s/II
› Move to the bottom left corner (-x, -y) of the base material using the
traverse buttons in
BoardMaster
such that the working depth limiter
does not quite come into contact with the adhesive tape.
› Program this corner in the
BoardMaster
menu
CONFIGURATION
,
MATERIAL
,
SET LOW CORNER
.
› In the same way, move to the top right corner (+x, +y) of the material
and program this under
CONFIGURATION
,
MATERIAL
,
SET HIGH
CORNER
.
› The material is shown in
BoardMaster
as light grey on the dark grey
machine surface.
› Select
LMD
or
LPR
under
FILE
,
IMPORT
and import the tutorial file
TUTOR.LMD
. (See also the instructions for importing the file null-
pkt.lmd in the section „Checking and correcting the HOME position“
on page 35)
› Position the view of the board in
BoardMaster
using
EDIT
,
PLACEMENT
such that all graphical data is located on the material.
Note: You can open the PLACEMENT dialogue box by right-clicking
when the mouse pointer is positioned immediately over the
graphical data.
› Select the first machining phase,
DRILLINGPLATED
.
› Click on to select the drilling data.
Selected data is shown brighter.
› Switch on
AUTO-MOTOR ON/OFF
.
› Close the hood on the
ProtoMat
95s/II.
The hood must always be closed when a tool is being changed.
› Click on
START
.
BoardMasterautomatically changes the tool for the one required in the
next machining phase. The auxiliary clamp fetches the required tool
from the tool magazine and takes it to the transfer station. The tool is
automatically handed over at the transfer station.The motor switches
on and the first drilling diameter of the drilling phase is executed.
Once the holes of the current diameter have been drilled, the next tool is
fitted in the same way.
› When the drilling phase has finished, the
MILLINGBOTTOM
milling
phase is selected once any galvanic through-hole plating has been
carried out.