Product manual
Maintenance and Repair
6-17
Part 1105120-01
E 2013 Nordson Corporation
9. See Figure 6-22. Arrange the secondary cable ferrites of both
transformers as shown. Install cable ties below the ferrites to prevent
them from sliding down the secondary cables, then install another cable
tie joining both pairs of secondary cables approximately 2 inches
(51 mm) above the ferrites.
Install Cable Ties Below Both Ferrites
Cable Tie Bundling
Secondary Cables
Ferrites
Figure 6-22 Installing Cable Ties on Secondary Cables
10. Slide new insulation sleeves over X2 secondary cables, and another
over both the X1 secondary cables and the 20AWG HV harness cables.
11. Slide the transformer bracket part way back into the wave guide
assembly.
12. Connect the bracket harness wires to the transformer H1 and H2 tabs
exactly as removed in step 5.
13. See Figure 6-18. Use the screws removed in step 3 to connect the X2
secondary cable to the magnetron F terminal pigtail. Connect the X1
secondary cable and the 20 AWG HV cable with ferrite to the FA
terminal pigtail.
14. Pull the black insulation sleeves over the terminals so that they are
completely covered. Secure the top and bottom of the sleeves with
cable ties.
15. Slide the transformer bracket all the way into the wave guide assembly.
Secure the bracket with the two M4 screws shown in Figure 6-16.