Operating instructions
ASSEMBLY
Assembly Section 2-7
LIFT VALVE MOUNTING
Attach the valve mounting plate to the mounting brackets. Align the holes on the plate to
the holes on the brackets. Use the hardware shown in the Parts Section to attach the plate to
the valve mounting brackets. Finally, place the valve on the valve mounting plate as shown in
the Parts Section. Align the holes on the valve assembly to the holes on the plate. Use the
hardware provided to secure the valve to the plate. Refer to the Parts Section for the
placement of the valve and the hardware used. Please handle the lift valve with care. It is
extremely heavy and contains small parts.
(ASM-MF-0010)
HIGH PRESSURE FILTER (CABLE CONTROL)
The high pressure filter is mounted to the right valve mounting bracket with hardware, as
shown in the parts section. Attach the two adapters to the filter. The pressure line from the trac-
tor is plumbed to the left (Inlet) side of the filter. The pressure hose that is attached to the right
side of the filter is routed to the pressure port of the Tiger lift valve.
(ASM-C-0031)
MANUAL SWITCH BOX MOUNTING
The switch box is to be secured to the operators side of the control handles, or valve stand.
Refer to the parts section for assembly and components needed.
(ASM-C-0053)