Product manual

Welding equipment
Installation
22
Installation_eng.fm
4.2 Installation of the wire feed system
The cables are connected as follows (see Figure 10):
1 Feeder cable 1, A140E, Feed unit - Control cabinet
23-pole connection at both ends
Feeder cable 1, A314E/A324E, Foot of the robot - Control cabinet
23-pole connection at both ends
2 Feeder cable 2, A140E Feed unit - Control cabinet
12-pole connection at Wire feed unit and 19-pole connection
at Control cabinet.
Feeder cable 2, A314E/A324E Foot of the robot - Control cabinet
12-pole connection at foot of the robot and 19-pole connection
at Control cabinet.
3 Gas (red hose). Connected to the central gas supply or to the gas cylinder.
The pressure guard functions as an open contact device, which means it
makes with a rising pressure. The guard is precalibrated to 0.2 bar (equiva-
lent to approx. 5 l/min.). The guard indicates when the gas is finished or if
an object prevents the gas flow.
4 Connection OUT for water (red hose).
5 Connection IN for water (blue hose).
6 Air in (PVC hose D14/8). Connected to the compressed air supply, system
pressure, approx., 6 bar.
7 Welding cable 95 m
2
.
8 Wire guide input for bobbin and Marathon Pac.
Finally connect the current cable from the wire feed unit to the power source.
Figure 10
j5000843
8
7
6
54
3
1
2