Instruction manual
3-2 1. 1 : 1 Connection
Wiring
Prepare the communication cable with the PLC on your side. Refer to the following
information for the cable. For more information on the connection to respective PLCs, refer
to “Chapter 5 Connection to PLCs.”
RS-232C Connection
• Connect the shielded cable either to the ZM-300 series or PLC side. This connection
diagram shows the case where the shielded cable is connected on the ZM-300 series
side. When connecting the shielded cable to the ZM-300 series side, connect it to pin 1
of the connector or the connector case cover.
• Twisted pairs of 0.3 mm sq. or above are recommended.
• If noise disturbs communications, use twist-pair cables between SD/SG and RD/SG.
DANGER
Electric shock hazard
Shut the power off before connecting cables.
FG
SD
RD
RS
CS
1
2
3
4
5
SG 7
ZM-300 (CN1)
Signal Name Pin No.
Shield
To the PLC’s
RS232C port
Receive data
SG
Send data
FG
SD
RD
RS
CS
1
2
3
4
5
SG 7
ZM-300 (CN1)
Signal Name Pin No.
Shield
To the PLC’s
RS232C port
Receive data
Send data
SG
SG