Technical data

13773-001
57-40
Page 2 30 Nov 2000
(b) Remove existing liquid shim material.
(c) Solvent clean the attach bracket with isopropyl alcohol. (Refer to 20-30)
(d) Apply release agent (Frekote NC700 or release tape) to inner surfaces of the attach
bracket.
(e) Mix liquid shim in accordance with manufactures instructions.
(f) Inject a 3/8-inch (9.5 mm) wide bead of liquid shim across the entire width (inner surface)
of the attach bracket.
CAUTION: Do not torque the attach bracket bolts to their final torque value of 60 inch-
pounds (plus drag torque) until after the liquid shim has fully cured. If bolts
are torqued before the liquid shim is allowed to fully cure, the attach bracket
may become deformed and allow the bolts to become improperly torqued
after the liquid shim has fully cured.
(g) Slide attach bracket up into position and loosely secure the bolts (with washers) until the
fitting is properly seated.
(h) Allow liquid shim to post-cure in accordance with manufacturers instructions.
(i) Final torque bolts to 60 inch-pounds (6.6 N-m) plus drag torque.
(j) Swing strut assembly up into position and secure strut clamp. Tighten to 190 inch-pounds
(20.9 N-m).
(k) Secure upper strut brake line union fitting.
(l) Fill brake system with hydraulic fluid as required. (Refer to 20-30)
(m) Bleed brake system. (Refer to 20-30)
(n) Lower airplane and remove jacks. (Refer to 7-10)
(o) Install main landing gear fairings. (Refer to 32-10)
(3) Removal - Upper Attachment Bracket
(a) Remove main landing gear. (Refer to 32-10)
(b) Remove collector tank access panel.
(c) Remove the bolts, washers, and locknuts from the upper landing gear fitting assembly.
(4) Installation - Upper Attachment Bracket
(a) Secure the upper landing gear fitting assembly with bolts, washers (one on each side),
and new locknuts.
(b) Install collector tank access panel.
(c) Install main landing gear. (Refer to 32-10)