Technical data

13773-001
27-30
Page 2 30 Nov 2000
(2) Installation - Elevator System Cable
(a) Install empennage pulley gang. (Refer to 27-20)
(b) At access hole CF5, install turnbuckles on forward and aft elevator cables.
(c) At access hole CF5, route forward elevator cable through forward and mid pulleys gangs.
(d) Install screws, washers, and nuts securing elevator cables to elevator pulley sector.
(e) At forward pulley gang, verify cable routing, insert pulley guard pins, and install washers
and cotter pins.
(f) At rudder-elevator pulley gang, verify cable routing, insert pulley guard pin, and install
washer and cotter pin.
(g) At empennage pulley gang, verify cable routing.
(h) Perform Elevator System Rigging Adjustment/Test. (Refer to 27-30)
(i) Perform Empennage Pulley Gang Inspection/Check. (Refer to 27-20)
(j) Install carpet and access panels CF5. (Refer to 6-00)
(k) Install RH mid console trim panel. (Refer to 25-10)
(l) Install LH mid console circuit breaker trim panel. (Refer to 25-10)
(m) Install passenger seats. (Refer to 25-10)