Technical data

13773-001
27-20
Page 2 30 Nov 2000
(j) At access hole CF5 pull forward rudder cables through and remove cables from airplane.
(2) Installation - Rudder System Cables
(a) Install empennage pulley gang. (Refer to 27-20)
(b) At access hole CF5, install turnbuckles on forward and aft rudder cables.
(c) At rudder pedal torque tubes, route forward rudder cable through mid and forward pulleys
gangs.
(d) Install bolts, washers, nuts and cotter pins securing rudder cables to rudder pedal torque
tubes.
(e) At forward pulley gang, verify cable routing, insert pulley guard pins, and install washers
and cotter pins.
(f) At rudder-elevator pulley gang, verify cable routing, insert pulley guard pin, and install
washer and cotter pin.
(g) At empennage pulley gang, verify cable routing.
(h) Install rudder/aileron interconnect to RH rudder cable. (Refer to 27-20)
(i) Perform Rudder System Rigging Adjustment/Test. (Refer to 27-20)
(j) Perform Rudder-Aileron Interconnect Adjustment/Test. (Refer to 27-20)
(k) Perform Empennage Pulley Gang Inspection/Check. (Refer to 27-20)
(l) Install carpet and access panels CF3C, CF4C, and CF5. (Refer to 6-00)
(m) Install RH mid console trim panel. (Refer to 25-10)
(n) Install passenger seats. (Refer to 25-10)