7.6.1.4 Maximum load: 2400Pa (wind/ snow), 2400Pa (suction)
Fig. 9d Mounting drawings for load level 2400Pa/2400Pa
All dimensions are shown in mm. Permissible clamping area shown as red crosses.
7.6.2 Tested snow load (The modules have passed the test of 5400Pa in accordance with IEC61215)
Fig. 9e Mounting drawings for tested snow load of 5400Pa
All dimensions are shown in mm.
*On lower frame part against sliding show
8 For operators: maintenance
Inspect and maintain your system to:
• Keep it safe and reliable
• Achieve top output
• Prevent damage and protect your investment.
8.1 Inspections
An inspection every year is recommended. This
should be a visual inspection. Refer to Ch. 8.3: „Details
for the inspections“.
8.1.1 Inspecting the generator
• Strings: condition of the insulation and mounting
• Condition of the junction box and the visible connectors
• For direct earthing: Connection of the earthing
conductors on the frames
• For indirect earthing: Connection of the frames to
the sub-structure and the earthing conductors to
the sub-structure
• Condition of the mounting system
• Dirt on modules: type and degree of dirt
• Shade circumstances (e.g. from trees or
neighbouring houses)
• Clean the components, if necessary.
8.1.2 Inspecting the documentation and drawings
• Checking the PV module string plan 6,
• Check the inverter's status reports
• Determine and archive the annual output
• Create and archive the inspection report.
8.2 Review
Carrying out a thorough review at least every 4 years is
recommended. This includes the following work in
addition to the inspection:
• Measure the characteristics of individual strings
(MPP current IMPP, open-circuit voltage UOC, power
output PMPP);
Pressure 24
00 Pa
Suction
2400 Pa
(Ca. 240kg/
m
2
, 240kg/m
2
)