Installation Manual RESU 7H DLT Type-C

28
Commissioning
4.2 Powering up the battery pack
Put the battery pack in operation by taking the following steps :
1. Make sure that the circuit breaker switch is in the OFF position.
2. Connect the power cable connector.
3. Move the circuit breaker switch to the ON position to turn on the main battery pack.
See if the battery pack is successfully initialized.
The power on indicator on the front should turn on in green.
4. Turn on the inverter.
4.3 Shutting o the battery pack
To shut down the battery pack, take the following steps :
1. Turn o the inverter.
2. Turn o the battery pack by moving the circuit breaker switch to the OFF position.
3. Make sure that every indicator on the battery pack is o. It would take 60
seconds at maximum for the indicators to turn o.
4. Disconnect the power cable connector in protection cover.