Installation Manual
Table Of Contents
- 1 Introduction
- 2 Safety
- 3 Installation
- 4 Troubleshooting
- 5 Emergency Situations
- 6 Warranty
- A Technical Information
Installation
3.4 Checking Before Operation
There are things that need to be checked before starting the battery pack to
ensure that it has no defects.
CAUTION
Make sure that the inverter is turned o while checking the battery pack.
Circuit breaker switch
Status
Charge / Discharge
RESU 6.4
R
Move the circuit breaker switch to the ON
position. If the switch is in the Trip posi-
tion between the ON and OFF positions,
move it to the OFF position and then to
the ON position. If the switch moves by
itself to any of the other positions, contact
LG Chem or your distributor.
Circuit breaker’s trip button
Status
Charge / Discharge
RESU 6.4
R
Make sure that the circuit breaker switch is
put in the ON position, and then push the
circuit breaker’s trip button. If the circuit
breaker switch has not moved to the Trip
position, contact LG Chem or your distrib-
utor.
29