Installation Manual
Table Of Contents
- 1 Introduction
- 2 Safety
- 3 Installation
- 4 Troubleshooting
- 5 Emergency Situations
- 6 Warranty
- A Technical Information
Installation
Status
Charge / Discharge
RESU 6.4
R
2. Make sure that the circuit breaker
switch is in the OFF position and that
the indicators on the front are o. If
the main pack has been operating, it
would take 60 seconds at maximum
for the indicators to turn o.
Status
Charge / Discharge
RESU 6.4
R
3. Cut the removable pieces out of the
grommets on the upper part of the
right side.
4. Remove the top cover from the expan-
sion battery pack.
23