Installation Manual
Table Of Contents
- 1 Introduction
- 2 Safety
- 3 Installation
- 4 Troubleshooting
- 5 Emergency Situations
- 6 Warranty
- A Technical Information
Installation
Status
Charge / Discharge
RESU 6.4
R
3. Make sure that the circuit breaker
switch is in the OFF position.
4. Cut the removable pieces out of the
grommets on the upper part of the left
side.
5. Connect the provided cable adapter
to the communication port, and then
connect the communication cable
coming from the inverter to the cable
adapter through the right grommet.
19