Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
11. Technical Specifications
Total Harmonic Distortion.
(Total harmonic factor of the output current with total
harmonic factor of the AC voltage < 2%,
and AC power > 50% of the rated power)
5%
Efficiency (PV to Grid)
European efficiency 95 % (when power is 4600W)
Max. efficiency 95.5 %
Protective Device
DC disconnection device for PV No
Ground-fault monitoring/grid monitoring Yes/Yes
General Data
Dimensions (W/H/D) 1000/680/267 mm
Weight 95 kg
Protective class (I, II, III) Class I
Degree of protection IP21
Max. permissible value for relative humidity 95 % (non-condensing)
Operating temperature -10~40°C
Storage temperature -20~60°C
Noise emission
≤ 50dB(A) @ 1m
Over voltage category III
Features
Display Custom LCD
Communication LAN, RS485
Energy management system Integrated
Certificates and approvals IEC 62109-1, IEC 62109-2
ER-G83/2, ER-G59/3
(*): It can be set 3600W or 4600W by software when installing.
[Table 11-1: Technical specifications]
88 United Kingdom (Eng.) 05/2015. Rev1.1