Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
8. Operation Test
[Figure 8-17: Event occurrence, PV string1 over voltage protection]
[Figure 8-18: Event occurrence, PV string1 over current protection]
[Figure 8-19: Event occurrence, PV string2 over voltage protection]
[Figure 8-20: Event occurrence, PV string2 over current protection]
[Figure 8-21: Event occurrence, Battery over voltage protection]
64 United Kingdom (Eng.) 05/2015. Rev1.1