Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
8. Operation Test
8.3.4 Standby Mode
This is the standby mode before converting to operation mode (PV Auto, PV Only, Battery
discharge mode). Conversion to the operation mode (PV Auto, PV Only, Battery discharge
mode) is made by the EMS decision.
[Figure 8-10: Indication screen on Standby Mode]
8.3.5 Forced-Charge Mode (Maintenance mode)
In this mode, solar energy generation is not used, but the power continuously flows from the
electric power system to the battery.
[Figure 8-11: Indication screen on Forced charged Mode]
8.3.6 Stand-Alone Mode
When the All In One is disconnected from the energy meter, or the power conversion system
is disconnected from the energy management system (EMS), the All In One system enters
into the Stand-Alone Mode. The system operates in a PV- only mode.
[Figure 8-12: Indication screen on stand-alone mode]
62 United Kingdom (Eng.) 05/2015. Rev1.1